- A retaining wall that holds back 1.5 m or less of ground with no surcharge is exempt from building consent (Building Act Schedule 1, exemption 20).
- Walls retaining more than 1.5 m, or carrying any surcharge (driveway, building, vehicles, a slope above), need building consent, whatever their height.
- In rural zones, walls up to 3 m designed or reviewed by a chartered professional engineer can be exempt (exemption 41).
- Exempt walls must still comply with the Building Code, and district plan rules can still require a resource consent.
The 1.5 metre rule
Schedule 1 of the Building Act 2004 lists building work that doesn't need a building consent. For retaining walls, exemption 20 covers a wall that retains not more than 1.5 metres depth of ground and does not support any surcharge or any load beyond the ground itself.
The 1.5 metres is the depth of ground retained, measured vertically from the ground at the bottom of the wall to the ground at the top. It isn't the length of the poles.
What counts as a surcharge?
A surcharge is any extra load on the ground behind the wall. Common examples on Canterbury sections:
- a driveway, parking area or road above the wall
- a house, garage or shed near the top of the wall
- a slope continuing up behind the wall (gently sloping ground may not count)
- another retaining wall close above it, as in terraced walls
- a fence built on top of the wall, which adds wind load
If any of these apply, the wall needs a building consent even if it's under 1.5 metres. In practice it will also need engineering design.
Rural walls up to 3 metres
Exemption 41 allows retaining walls in rural zones that retain up to 3 metres of ground without a building consent, as long as a chartered professional engineer designs or reviews the work. This helps on farms and lifestyle blocks, but you still need the engineer.
What still applies to an exempt wall
Being exempt from consent doesn't mean anything goes. All building work must still comply with the Building Code, so the wall must be built to stand up, with proper drainage. District plan rules from Christchurch City Council or Selwyn District Council can also apply. Earthworks volumes, work near boundaries, waterways or natural hazard areas (common on the Port Hills) can all trigger a resource consent.
Quick examples
| Situation | Building consent? |
|---|---|
| 1.2 m garden wall, flat lawn above | Usually no |
| 1.0 m wall with the neighbour's driveway above | Yes (surcharge) |
| 1.8 m wall, lawn above | Yes (over 1.5 m) |
| Two 1.2 m terraced walls close together | Likely yes (upper wall surcharges the lower) |
| 2.5 m wall on a rural farm, engineer-designed | Can be exempt under exemption 41 |
How we help
At our free site visit we'll measure the retained height, look at what sits above the wall and tell you whether you're likely to need consent. If you do, we arrange the engineering design, prepare the consent paperwork with the engineer and coordinate inspections, so you don't have to manage it yourself. See retaining walls.
This guide is general information, not legal advice. Check with your council or use the government's Can I Build It? tool for your exact situation.